An inspector finds a narrow pocket opening on three shirts. The first question for the buyer is how many fronts have already passed that sewing operation. If the factory can trace the bundle and check the next pieces off the machine, the team can act while the order is still on the line. This checklist follows that decision from the production brief to the final handover.
When to schedule the visit
Schedule an inline garment inspection in Bangladesh around the operation you need to observe. For a woven shirt, that might be sleeve setting or attaching the collar. Ask the production manager when the first bundles will reach that operation, which colours and sizes will be running, and whether finished examples will be available to measure. A calendar booking alone tells the inspector very little about what they can check.
Consider a buyer ordering a navy shirt and an ivory shirt from the same factory. On Tuesday the line has sewn navy fronts, but the ivory fabric is still awaiting cutting approval. A Tuesday visit can answer questions about navy placket construction. It cannot answer whether the ivory pocket bags show through under the buyer’s viewing conditions. Give that question a separate follow-up date.
Prepare a one-page inspection brief
Put the purchase order, style, colourways and production location at the top of the brief. Identify the approved technical pack by revision and date. List the sealed sample and any later written approvals separately. A sample may show the intended shape of a pocket while a later drawing changes its placement. Resolve that difference with the buyer before treating either reference as the acceptance requirement.
Give the inspector three questions that could change a production decision. For example, are the collar points balanced after pressing? Does the smallest size meet the approved opening measurement? Can the factory trace a mismatched sleeve back to its cutting bundle? For each question name the reference, the production stage and the person authorised to resolve a disagreement.
Select pieces you can trace
Walk the line with the supervisor and note what is actually available. Record line number, bundle identifiers, size, colour and operation. Select pieces across relevant bundles and operators where access permits. Keep targeted checks on suspect pieces separate from routine observations. This lets the buyer see why the inspector found several examples of a known issue without mistaking that finding for a rate across the entire order.
If the factory has split one style between two floors, identify the floor represented in each observation. A clean result on the morning shift of one line leaves the second line an open question. In the report, describe unavailable sizes and unvisited lines plainly. Give the next inspector enough information to complete the missing coverage.
Inspect the operation where the issue begins
Follow a suspect piece upstream. A crooked shirt placket may become obvious after buttoning, yet the first visible shift might occur when the operator folds the front edge. Compare an unsewn front, a folded front and an assembled shirt from the same bundle. Photograph the earliest stage that shows the deviation and record what was visible at the later stage.
Use the approved construction details to assess workmanship. On a jacket, close the zip and lay the fronts flat before judging their alignment. On a polo, check the collar attachment and the finished opening against the reference. Describe location and consequence precisely. ‘Left front hem sits lower with zip closed’ gives the production team a repeatable check. ‘Poor finishing’ leaves the team guessing.
Record measurements that another person can repeat
Use the buyer’s point-of-measure diagram, units, preparation method and tolerance. Record garment identity and actual readings. A flat half-chest width and a full circumference are different measurements. If a specification gives a finished, washed dimension, label readings taken before washing as intermediate results. Ask for the approved intermediate target before using them to judge conformity.
Suppose a buyer specifies a finished pocket opening of 15.0 cm with a tolerance of ±0.3 cm. An opening measured at 14.6 cm is 0.4 cm below target and 0.1 cm below the permitted lower limit. Record 14.6 cm and the garment identifier. Recheck the endpoints with the operator before deciding which bundles to contain. These figures illustrate the calculation and apply only to this example.
Contain affected work and verify the correction
Ask the supervisor to identify the last known acceptable bundle and the first observed failure. Mark potentially affected work and record where it is held, including pieces already transferred to the next operation. Keep the quantity awaiting inspection separate from the confirmed defect count. When bundle identity is missing, document that uncertainty so the buyer can decide whether the search needs to widen.
Check two populations before closing the finding. First, examine the held pieces after sorting or repair. Second, inspect fresh output made under the corrected setup. A repaired pocket shows that a piece can be recovered. Fresh pockets from a later bundle show whether the revised operation is continuing to produce the intended opening. Give both results and the time of each check.
Write the handover for the next decision
Start the report with the decision the buyer needs to make. State the affected style and bundles, the observed deviation, the containment status and the unresolved question. Attach a general view for orientation and a close-up taken against the relevant reference. Name the action owner and the deadline in local time, particularly when the buyer and factory work in different time zones.
Before the final visit, send the outstanding items to the person preparing the pre-shipment inspection brief. Ask them to confirm availability of the colours or sizes missed during production and verify that repaired units can be traced. If the buyer granted a concession, include its exact scope and written approval. A concession for one purchase order should never silently become the reference for a repeat order.
Example inspection log for a woven shirt order
The figures below are illustrative. Each row answers a different question about the same pocket-opening finding.
| Check | Evidence recorded | Next decision |
|---|---|---|
| Initial observation | 3 of 8 targeted navy fronts below the 14.7 cm lower limit | Hold identifiable work from the suspect operation |
| Containment | 60 fronts held and screened, including the original 8. In total, 12 needed repair. | Separate the 12 for repair and verify each one |
| Repair verification | All 12 repaired openings measured within the approved range | Record disposition of held stock |
| Fresh output | 6 fresh fronts checked across the next two bundles, all within range | Record the follow-up result and retain the check at line handover |
Related reading
- Technotex’s pre-shipment garment inspection guide
- ISO certification preparation for garment factories
- Recording measurement findings during an inspection
Frequently asked questions
How does inline inspection differ from pre-shipment inspection?
Inline inspection examines work while production is in progress and corrections can still be checked on fresh output. Pre-shipment inspection examines the presented shipment at the agreed stage against the buyer’s release criteria.
What if a colour or size is unavailable?
Identify the missing colour or size in the report, explain which operation was unavailable and assign a follow-up check when the relevant pieces will be ready.
Can an inline defect count establish an order-wide defect rate?
A targeted check of suspect bundles cannot establish a representative rate for the whole order. Record the selection method, quantities checked and limits of coverage.
Who can approve a deviation?
Use the approval authority in the buyer’s agreement. Record the written decision, affected quantities, purchase order and any conditions before releasing held pieces.

